Marine Project

Port Nolloth marine infrastructure rehabilitated for Transnet, Northern Cape, 2016-2017

The Project Scope

The scope of marine infrastructure refurbishment undertaken by Stefanutti Stocks Coastal at Port Nolloth, included:

  • removal of existing tyre fenders;
  • installation of new tyre fenders;
  • refurbishment of existing bollards;
  • concrete rehabilitation to the side faces and underside of the jetty structure; and
  • rock revetment construction.

The water-based remedial work, undertaken to the underside of the jetty structure was accessed using a temporary access platform constructed below neap low tide level.

The 70-metre rock revetment was completed within five months, by offloading and placing rocks using special excavator mounted thumbs welded onto an excavator boom on site.