Construction of new liquid chemical berth (Berth 208) for Transnet, KZN 2010

The Project Scope

Stefanutti Stocks Coastal constructed the new Liquid Chemical Berth 208 for Transnet Capital Projects (TCP). This marine infrastructure construction project included the positioning of 72 reinforced precast concrete beams, which had to straddle adjacent pile caps. The beams, weighing between 65 and 75 ton were placed off a barge and this activity required careful planning in order to optimise safe working conditions. The beams could not be placed if the wind speed exceeded 40km/hr, if wave heights exceeded 0.5m and/or if tidal heights weren’t within a specific window.