Skip to main content

Slurry Removal

Slurry removal for DMO

Client: South 32 Mine

Description: The waste product from the mine is deposited into five dams via a ringfeed HDPE line system. Stefanutti Stocks’ Material Handling division reclaims the slurry from these five dams by loading and transporting the wet slurry from the dams with articulated dump trucks to a temporary stockpile 2.5km from the dams. After a drying period the slurry waste is loaded onto tipper trucks and then disposed in a void approximately ten kilometre from the designated spoil area.

Sector: Mining & Mine Infrastructure - material handling 

Slurry removal for DMO - Stefanutti Stocks
Slurry removal for DMO - Stefanutti Stocks
Back to top