Client: Sasol 

Description:  Installation of mechanical equipment; electrical and instrumentation; fabrication and installation of piping spools and process systems. 

  • Mechanical equipment: 700 tons
  • Structural steel: 400 tons
  • Pre-assembled modules and racks: 734 tons
  • Process piping-welding of 110 000 diameter inches for fabricated spools and 12 000 diameter inches for erection.
  • Electrical & instrumentation
  • Rack: 3 500 metres
  • Conduit: 15 500 metres
  • Cable: 187 000 metres
  • Junction boxes: 1 486
  • Instruments: 1 036
  • Earthing: 6 300 metres
  • Tubing: 9000 metres

Division: Stefanutti Stocks Oil & Gas

Coal Tar Filtration - East - Stefanutti Stocks