Skip to main content

Road Rehabilitation

Bottom Road, Zambia

Client: Road Development Agency (RDA) Zambia

Description: The Bottom Road project spans a distance of 107,5 kilometres and runs along Lake Kariba in a north-south direction from Chaboboma via Sinazeze to Sinazongwe. The project entails:

  • 720 000m3 of earthworks;
  • 325 000m3 of layerworks; 
  • construction of six bridges with precast beams of different spans; and
  • 26 500m3 in situ, reinforced concrete culverts.

Sector: Transport Infrastructure - road construction

Back to top