Skip to main content

Road Rehabilitation

Airport Arcades Road upgrade

Client: Road Development Agency (RDA) Zambia

Description: Stefanutti Stocks Zambia completed the upgrade of ten kilometres of the Great East Road, running from Arcades to Airport Junction in Lusaka where the asphalt surfacing had deteriorated and aged. The road rehabilitation included the excavation and backfilling with rock of a three-kilometre long section of the dual carriageway; the reconstruction of the layers and surfaces, as well as improved drainage along the whole ten kilometres, and resurfacing with bitumen.

Sector: Transport infrastructure (road)

Back to top