Serengeti Phase 1 (Whistling Thorns) and Phase 2 (The Lakes):

At Serengeti Golf Estate Stefanutti Stocks Building Gauteng constructed 28 Blocks consisting of 8 units and 6 blocks consisting of 12 units for the client African Kingdoms Holdings.

Finishes to the buildings consisted of painted plastered facades with parts being stone cladding, internal finishes consisted of painted plastered walls with high end kitchen units, bathroom fittings and tiled floors. Hollow core pre-cast slabs were installed for first floor and the roof structure was timber trusses with Saflock sheeting.

Whistling Thorns Phase 1 and 2 had a value of R242,592,010 excl. VAT.

Phase 1 started in 01 March 2018 for and was completed on 30 March 2019.

Phase 2 started on 15 October 2018 and was completed on 10 September 2019.

.