Skip to main content

Commercial Buildings

Shoprite Climor Distribution Centre

This distribution centre construction project was built within a tight programme; with the use of tilt-up columns (up to 23m high) and some walls; and structural steel and roof sheeting. Some sheets, in excess of 90m long, were rolled on site for the large curved roofs of the dry goods warehouse and returns centre. Transrite facilities included workshops, refueling buildings, tanks and pumping stations, gatehouse and entry facilities, landscaping, and high quality and accurate concrete floors. External works and smaller buildings were programmed early into the project plan.

Shoprite Climor Distribution Centre - Stefanutti Stocks
Shoprite Climor Distribution Centre - Stefanutti Stocks
Shoprite Climor Distribution Centre - Stefanutti Stocks
Klein D'Aria - Stefanutti Stocks
Back to top